TEKNOFEST 2026 · Top 10 of 500
AI logistics linehaul optimizer
Technical lead of a four-person team. The planner turns seven days of forecast demand into a vehicle plan over 18 transfer centers. Total cost fell 20.4% (13.47M to 10.72M TL) with zero hard-constraint violations. The biggest lever was en-route drop-off, worth 2.42M TL. The full run takes 197 seconds, is deterministic and ships with 125 automated tests.
Python · Forecasting · Heuristic search